​The culvert was constructed between 1907-1911 carrying the Ouseburn underneath the suburb of Heaton. It runs for a total length of 2150 ft and built at a cost of £23,000. From 1911 the valley in which the Ouseburn runs through was filled gradually over 40 years of industrial and...